With winter coming in, it has become clear that we need to have a good method of covering vessels undergoing repair. We need to minimise downtime dur to wet weather, and the best way to overcome this is by using the shrink wrap method of covering. We build a scaffold structure over the job, and then cover that.
Being independent and having our own shrink wrap gear means that we can adjust and change the covers as the job demands.